Introduction of a Quality Management System at an Industrial Enterprise: Problems and Risks
Lebedynets V. O., Prokhorenko O. V.

Lebedynets, Viacheslav O., and Prokhorenko, Olena V. (2020) “Introduction of a Quality Management System at an Industrial Enterprise: Problems and Risks.” The Problems of Economy 4:177–186.
https://doi.org/10.32983/2222-0712-2020-4-177-186

Section: Economics and Enterprise Management

Article is written in Ukrainian
Downloads/views: 1

Download article in pdf format -

UDC 006.015

Abstract:
The purpose of the article is to substantiate a sound plan to design and implement a quality management system (QMS) at a typical domestic industrial enterprise: from the pre-design phase to obtaining a conformity certificate; to highlight problems that arise during the implementation of QMS, and to suggest sound recommendations for their solution. The introduction of QMS is considered as a project with the appropriate stages: the initiation stage, which means making decision on introducing QMS and appointing the project manager and task group; the planning stage, which means training the task group, defining the mission, vision, and policy in the field of the company quality, and designing the structure of QMS processes; the implementation stage, which means creating and publishing QMS documents and those of the pre-certification internal audit cycle; the completion stage, which means implementing all the documented procedures designed, and obtaining a certificate of their compliance with the requirements of ISO 9001 standart. The stages of such a project, their sequence, the estimated duration and distribution of responsibilities between the persons involved are offered. Possible problems arising at various stages of such a project are considered, namely: the conflict of QMS processes structure with the existing organizational set-up; unification of terms in the QMS processes structure due to the terminology already existing in the internal documentation; vague definition or lack of performance indicators; difficulties with the creation of the documentation system. Among the causes of these problems are: lack of motivation, unprofessionalism and / or lack of time among the developers, attempts to adapt to the existing system, the inconsistency of the actual goals of the organization head with the declared ones. It is recommended to divide the problem areas into three groups: by the performers (personal ones), by the system (systemic ones) and by the management of the company (administrative or leadership ones). A number of measures to eliminate or minimize the risks of problems arising during the introduction of QMS are suggested, and the responsibility areas as for taking these measures are determined.

Keywords: ISO 9001 standard, quality management system (QMS), QMS implementation project, QMS performance, risks in QMS implementation.

Fig.: 3. Tabl.: 1. Bibl.: 14.

Lebedynets Viacheslav O. – Professor, Professor, Department of Management, Economics and Quality Assurance in Pharmacy, National Pharmaceutical University (53 Pushkіnska Str., Kharkіv, 61002, Ukraine)
Email: v.o.lebedynets@gmail.com
Prokhorenko Olena V. – Candidate of Sciences (Economics), Associate Professor, Associate Professor, Department of Management and Taxation, National Technical University «Kharkiv Polytechnic Institute» (2 Kyrpychova Str., Kharkіv, 61002, Ukraine)
Email: a_prokhorenko@meta.ua

List of references in article

Alic, M. “Issues of ISO 9001: Implementation: Improper praxes leading to bureaucracy“. Dynamic Relationships Management Journal, vol. 2, no. 1 (2013): 55-67.
Almeida, D., Pradhan, N., and Muniz Jr, J. “Assessment of ISO 9001:2015 implementation factors based on AHP“. International Journal of Quality & Reliability Management, vol. 35, no. 7 (2018): 1343-1359.
Bhuiyan, N., and Alam, N. “An investigation into issues related to the latest version of ISO 9000“. Total quality management and business excellence, vol. 16, no. 2 (2005): 199-213.
Bravi, L., Murmura, F., and Santos, G. “The ISO 9001:2015 Quality Management System standard: Companies' drivers, benefits and barriers to its implementation“. Quality Innovation Prosperity, vol. 23, no. 2 (2019): 64-82.
Faisal, A. M. “Case studies on the implementation of TQM in the Indian Leather SMEs“. International Journal of Quality and Innovation, vol. 3, no. 1 (2016): 17-29.
“Dovidka «Zovnishnia torhivlia Ukrainy tovaramy ta posluhamy u I kvartali 2020 roku»“ [Reference "Foreign Trade of Ukraine in Goods and Services in the First Quarter of 2020"]. https://www.me.gov.ua/Documents/Detail?lang=uk-UA&id=d294f7fc-4e7f-41a3-a50a-9e190e32c0b7&title=DovidkazovnishniaTorgivliaUkrainiTovaramiTaPoslugamiUIKvartali2020-Roku
Kaidalova, A. V. et al. “Vyznachennia etapiv rozrobky ta vprovadzhennia systemy yakosti na farmatsevtychnomu pidpryiemstvi vidpovidno do vymoh ISO ta GMP“ [Determining the Stages of Development and Implementation of a Quality System at a Pharmaceutical Company in Accordance with the Requirements of ISO and GMP]. Visnyk farmatsii, no. 4 (2008): 65-67.
Lebedynets, V. O. “Reformuvannia orhanizatsiinoi struktury pidpryiemstva z vyrobnytstva likarskykh zasobiv pry vprovadzhenni systemy upravlinnia yakistiu“ [Reforming the Organizational Structure of the Enterprise for the Production of Medicines in the Implementation of Quality Management System]. Upravlinnia, ekonomika ta zabezpechennia iakosti v farmatsii, no. 5 (2014): 35-40.
Lysenko, V., and Tavlui, I. “Peredumovy vprovadzhennia systemy upravlinnia yakistiu u vyshchomu navchalnomu zakladi“ [Prerequisites for Implementing a Quality Management System in Higher Education]. Standartyzatsiia. Sertyfikatsiia. Yakist, no. 4 (2011): 65-69.
Nastanovy shchodo provedennia audytiv system upravlinnia (ISO 19011:2018, IDT) : DSTU ISO 19011:2019 [Guidelines for Conducting Audits of Management Systems (ISO 19011:2018, IDT) : ДСТУ ISO 19011:2019]. Kyiv: DP «UkrNDNTs», 2020.
Nastanovy z rozrobliannia dokumentatsii systemy upravlinnia yakistiu : DSTU ISO/TR 10013:2003 [Chynnyi vid 2004-07-01] [Guidelines for the Development of Quality Management System Documentation: DSTU ISO / TR 10013: 2003 [Valid from 2004-07-01]]. Kyiv: Derzhspozhyvstandart Ukrainy, 2004.
Popovych, T., and Halko, L. “Identyfikatsiia ta upravlinnia ryzykamy v protsesi vprovadzhennia systemy upravlinnia yakistiu v orhanizatsii“ [Identification and Risk Management in the Process of Implementing a Quality Management System in the Organization]. Aktualni problemy menedzhmentu v umovakh innovatsiinoho rozvytku ekonomiky. Ternopil. 193-197.
Systemy upravlinnia yakistiu. Vymohy (ISO 9001:2015, IDT) : DSTU ISO 9001:2015. [Na zaminu DSTU ISO 9001:2009; chynnyi vid 2016-07-01] [Quality Management Systems. Requirements (ISO 9001: 2015, IDT): DSTU ISO 9001: 2015. [To Replace DSTU ISO 9001: 2009; Valid from 2016-07-01]]. Kyiv: DP «UkrNDNTs», 2016.
Systemy upravlinnia yakistiu. Vymohy: DSTU ISO 9001:2009 [Chynnyi z 2009-09-01] [Quality Management Systems. Requirements: DSTU ISO 9001: 2009 [Valid from 2009-09-01]]. Kyiv: Derzhspozhyvstandart Ukrainy, 2009.

  The Promblems of Economy, 2009-2024 The site and its metadata are licensed under CC-BY-SA. Write to webmaster